Offer


Sub: Offer for Consulting Services for Electro-Mechanical Facility Service of Construction Building

Dear Sir,
Thank you a lot for your interest to me. The complete offer is enclosed along with fees.

Sl No.
Services
Fees
01.
Electrical System (Internal and External)
Tk. 2.00/sft
02.
Telephone and Intercom system
Tk. 0.80/sft
03.
Master antenna Television (MATV) System
Tk. 0.80/sft
04.
Speaker and public address (PA) System
Tk. 0.80/sft
05.
Closed Circuit Television (CCTV) System
Tk. 0. 80/sft
06.
Fire detection and alarm System
Tk. 0. 80/sft

The fees will be as per services selected and multiplied by the area where services will be provide

Our Scope of Services:

i. Preliminary drawing
ii. Final drawings
iii. Specification & Bill of Quantities

Deliveries:

All documents and drawings by Email

Schedule of Time:

i. Submission of preliminary design 30 days after the date of signing
ii. Submission of all finalize drawing after 30 days of owner approval
iii. Submission of schedule of item and bill of quantity after 30 days of final drawing submission

Design Services:

a)      Electrical system

i)  Preliminary Electrical system drawing for approval
ii)  Finalizing electrical drawing for construction
(Electrical Fixture Layout, Conduit Layout, Sub-Station Equipment Base & Trance Layout, Electrical Load Calculation, Electrical Single Line Diagram of Sub-Station, Electrical CKT Diagram, Electrical Riser Diagram, Emergency Circuit Diagram, Sub-Station Equipment Earthing pit Layout, Sub-Station Equipment Earthing Detail, LT Panel PFI  DB & SDB Stricture Detail Layout, Air Terminal & Earthing pit Layout, Lightning protection by conventional method, Schedule and bill of quantities)

a)      Other system
i) Preliminary drawing for approval
ii) Finalizing drawing for construction
(Fixture Layout, Riser Diagram, Schedule and bill of quantities)

Payment Terms:

a)      Design phase:
i) On acceptance of the proposal an initial payment 30% of approved amount will be paid.
ii) 40% of approved amount will be paid after submission the preliminary design and drawings for
approval.
iii) 20% of approved amount will be paid after submission final drawing.
iv) 10% of approved amount will be paid after submission of schedule and bill of quantities

b)      Supervision Fees:
Supervision fees will be paid after every visit.
Supervision fees will be Tk.1,500 (One thousand Five Hundred) only each visit.

Mode of payment:
Payment will be Cash / Account Payee cheque in favour of Milton Kumar Howlader

Hope, you will accept our offer

Thanking you,

Yours sincerely,

Eng. Milton Kumar Howlader
B.Sc in Engineer (EEE)
Mobile: 01777-781216, 01819-191916
Email: miltonhowlader@gmail.com